Skip to content

Where are you from?

Choose your province and we will tell you how the deputies and senators you elected vote, one by one.

 

We remember it in this browser. If you create an account, we keep it there.

Type a law, a topic, a person or a province.

What it is

Rules for storing CO2 underground safely

BOE step 7 of 7 · Passed

It is a government bill. Introduced by the Government. It was introduced on 9 April 2010. Introduced by: Gobierno.

Official title: Government bill on geological storage of carbon dioxide.

Source: Congreso de los Diputados, file 121/000078· updated 11 Nov

Automatic summary, not yet reviewed

  1. The law creates the legal framework for injecting and storing CO2 in underground geological formations, safely for the environment and health, to help fight climate change. It applies to underground structures in Spain, including territorial waters, the exclusive economic zone and the continental shelf, and bans storing CO2 in the water column or on the seabed.
  2. The geological formations used as storage sites are state public domain property: they cannot be sold, acquired by prescription or seized.
  3. The Ministry of Industry, Tourism and Trade grants and revokes storage concessions and research permits affecting more than one autonomous community or the marine subsoil. The autonomous communities approve monitoring plans, carry out inspections and oversee corrective measures.
  4. Exploring whether a site can store CO2 requires a research permit, which must be decided within one year and lasts at most 4 years. Storing CO2 requires a storage concession, which gives the exclusive right to store at that site, lasts 30 years with extensions, and is granted by the Ministry of Industry, Tourism and Trade.
  5. Anyone applying for a concession must provide a financial guarantee covering their obligations, including site closure and possible leaks. If the guarantee is used and not restored within two months, the concession is revoked.
  6. The operator must monitor the storage site under a monitoring plan, report at least once a year and immediately notify any leak or significant irregularity. The autonomous communities inspect at least once a year and can require or adopt corrective measures, recovering the costs from the operator.
  7. Responsibility for a closed site passes from the operator to the State only when all available evidence shows the CO2 will remain completely and permanently confined, at least 20 years have passed since closure, and financial obligations have been met. The operator contributes money to a financial instrument that covers later monitoring.
  8. The law defines very serious, serious and minor offenses. Fines range from up to €200,000 for minor offenses to between €2,000,001 and €5,000,000 for very serious ones, such as injecting CO2 without the required permit.

Who it affects

  • Energy and industrial companies that want to store CO2: They need a research permit and a storage concession, must provide a financial guarantee, and must meet monitoring, reporting and closure obligations.
  • Autonomous communities: They approve monitoring plans, carry out inspections and oversee corrective measures at storage sites.
  • The Industry and Environment ministries: They grant permits and concessions, keep the registries and manage the transfer of responsibility to the State after closure.
  • The general public: Can consult information on CO2 storage, which public authorities must make available.

Words worth knowing

Concesión de almacenamiento (storage concession)
Administrative authorization giving its holder the exclusive right to store CO2 at a specific site.
Permiso de investigación (research permit)
Authorization to study whether an underground area is suitable for CO2 storage.
Fuga (leak)
Any escape of CO2 from the storage complex.
Irregularidad significativa (significant irregularity)
A problem in injection operations or at the storage site that poses a risk of leakage or a risk to the environment or health.
Dominio público estatal (state public domain)
Property owned by the State for public use that cannot be sold or seized.

It summarizes the law as published in the BOE. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 7 of 7 steps. It reached BOE, and today it is passed.

  1. Introduced9 April 2010Someone registers the text in the Congreso.
  2. Admitted13 April 2010The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendments16 April 2010Groups propose changes.
  4. Committee26 May 2010A committee goes through the text in detail.
  5. Plenary21 September 2010All 350 deputies vote.
  6. Senate30 September 2010The Senate can pass it, amend it or veto it.
  7. BOE16 December 2010It is published in the Official State Gazette (BOE) and comes into force.
See the 12 official steps on a timeline
Apr 2010May 2010Jun 2010Jul 2010Aug 2010Sept 2010Oct 2010Nov 201011. 9 April 2010: Presentación22. 13 April 2010: Comisión de Medio Ambiente, Agricultura y Pesca Publicación desde 13/04/2010 hasta 16/04/201033. 13 April 2010: Calificación44. 16 April 2010: Comisión de Medio Ambiente, Agricultura y Pesca Enmiendas desde 16/04/2010 hasta 26/05/201055. 26 May 2010: Comisión de Medio Ambiente, Agricultura y Pesca Mesa - Calificación desde 26/05/2010 hasta 26/05/201066. 26 May 2010: Comisión de Medio Ambiente, Agricultura y Pesca Debate de totalidad desde 26/05/2010 hasta 17/06/201077. 17 June 2010: Comisión de Medio Ambiente, Agricultura y Pesca Informe desde 17/06/2010 hasta 28/06/201088. 28 June 2010: Comisión de Medio Ambiente, Agricultura y Pesca Dictamen desde 28/06/2010 hasta 21/09/201099. 21 September 2010: Pleno Aprobación desde 21/09/2010 hasta 30/09/20101010. 30 September 2010: Senado desde 30/09/2010 hasta 01/12/20101111. 1 December 2010: Pleno Enmiendas o veto del Senado desde 01/12/2010 hasta 16/12/20101212. 16 December 2010: Concluido - (Aprobado con modificaciones) desde 16/12/2010 hasta 08/02/2011

Was there a plenary vote?

We have no plenary vote linked to this law in the Congreso’s data.

What happens next

What happens now?

It is law, or will be once published in the BOE. It comes into force on the date its own text sets.

The same initiative in the other chamber:

Published in the BOE: Law 40/2010, of December 29, on the geological storage of carbon dioxide.

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.