Skip to content

Where are you from?

Choose your province and we will tell you how the deputies and senators you elected vote, one by one.

 

We remember it in this browser. If you create an account, we keep it there.

Type a law, a topic, a person or a province.

What it is

Spain updates its greenhouse gas emission allowance trading market to EU rules

BOE step 7 of 7 · Passed

It is a government bill. Introduced by the Government. It was introduced on 10 June 2020. Introduced by: Gobierno.

Official title: Government bill to amend Act 1/2005, of 9 March, regulating the regime of trade in greenhouse gas emission allowances, to intensify emission reductions in a cost-effective manner.

Source: Congreso de los Diputados, file 121/000023· updated 11 Nov

Automatic summary, not yet reviewed

  1. The law amends Law 1/2005, of March 9, to bring Directive (EU) 2018/410 into Spanish law. That directive strengthens the EU emission allowance trading system in its phase IV, covering 2021-2030.
  2. Allowances issued from January 1, 2013 are valid indefinitely and count as financial instruments. The 2021-2030 trading period is split, for stationary installations, into two allocation periods: 2021-2025 and 2026-2030.
  3. Auctioning remains the basic method for allocating allowances, and the State Secretariat for the Environment organizes the auctions and acts as auctioneer. If an installation stops generating electricity because of additional national measures, allowances pending auction can be canceled.
  4. Sectors at significant risk of carbon leakage keep receiving 100 % of their allowances for free. Other sectors see their free allocation reduced: 30 % until 2026, then a yearly cut down to zero by 2030, except urban heating, which keeps the 30 %.
  5. If an installation's activity level rises or falls more than 15 % compared with the level used to calculate its free allocation, the number of allowances is adjusted. Excess allowances must also be returned, and failing to do so is a very serious offense.
  6. Installations receiving free allowances must monitor the activity levels of their sub-installations and submit a verified report every February 28, in addition to the annual emissions report.
  7. For aviation, non-commercial aircraft operators emitting under 1,000 metric tons of CO2 per year are excluded from the system until December 31, 2030, and the exemption for flights to or from outside the European Economic Area is extended until 2023.
  8. Small installations (under 25,000 metric tons of CO2 equivalent per year) and hospitals can remain excluded from the system until 2025 if they adopt equivalent mitigation measures. A report is due in 2023, and the Government may extend the exclusion from 2026.

Who it affects

  • Operators of stationary installations covered by the system (industry and energy): They must hold an emissions permit, monitor and report their emissions and activity levels, and surrender allowances each year by April 30.
  • Small installations and hospitals: They can be excluded from the system until 2025 if they adopt equivalent mitigation measures and meet simplified monitoring requirements.
  • Aircraft operators managed by Spain: They must submit monitoring plans and verified emissions reports, and can request free allocation or access to the special allowance reserve.
  • Companies and individuals trading emission allowances: They can buy allowances at auctions and trade in the market, but must open an account in the European Union Registry.
  • Autonomous communities (regional governments): They issue emissions permits and sanction most offenses by stationary installations in their territory.

Words worth knowing

Derecho de emisión (emission allowance)
A permit to release one metric ton of CO2 equivalent into the atmosphere. Those who pollute less than their allocation can sell their leftover allowances.
Fuga de carbono (carbon leakage)
When a factory moves to a country with no comparable emission rules, increasing pollution there instead of reducing it.
Asignación gratuita (free allocation)
Emission allowances an installation receives without paying for them, under EU rules.
Nuevo entrante (new entrant)
An installation that obtains its emissions permit for the first time within a set period around an allocation period.
Subinstalación (sub-installation)
Each of the parts an installation is divided into to calculate free allocation and adjust it to actual activity.

It summarizes the law as published in the BOE. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 7 of 7 steps. It reached BOE, and today it is passed.

  1. Introduced10 June 2020Someone registers the text in the Congreso.
  2. Admitted16 June 2020The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendments19 June 2020Groups propose changes.
  4. Committee24 September 2020A committee goes through the text in detail.
  5. Plenaryno dateAll 350 deputies vote.
  6. Senate10 November 2020The Senate can pass it, amend it or veto it.
  7. BOE2 December 2020It is published in the Official State Gazette (BOE) and comes into force.
See the 8 official steps on a timeline
Jun 2020Jul 2020Aug 2020Sept 2020Oct 2020Nov 202011. 10 June 2020: Presentación22. 16 June 2020: Comisión de Transición Ecológica y Reto Demográfico Publicación desde 16/06/2020 hasta 19/06/202033. 16 June 2020: Calificación44. 19 June 2020: Comisión de Transición Ecológica y Reto Demográfico Enmiendas desde 19/06/2020 hasta 24/09/202055. 24 September 2020: Comisión de Transición Ecológica y Reto Demográfico Informe desde 24/09/2020 hasta 20/10/202066. 20 October 2020: Comisión de Transición Ecológica y Reto Demográfico Aprobación con competencia legislativa plena desde 20/10/2020 hasta 10/11/202077. 10 November 2020: Senado desde 10/11/2020 hasta 02/12/202088. 2 December 2020: Concluido - (Aprobado con modificaciones) desde 02/12/2020 hasta 25/01/2021

Was there a plenary vote?

We have no plenary vote linked to this law in the Congreso’s data.

What happens next

What happens now?

It is law, or will be once published in the BOE. It comes into force on the date its own text sets.

The same initiative in the other chamber:

Published in the BOE: Law 9/2020, of December 16, amending Law 1/2005, of March 9, regulating the regime for trading in greenhouse gas emission allowances, to intensify emission reductions in a cost-effective manner.

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.