Skip to content

Where are you from?

Choose your province and we will tell you how the deputies and senators you elected vote, one by one.

 

We remember it in this browser. If you create an account, we keep it there.

Type a law, a topic, a person or a province.

What it is

Rules to prevent, recycle and manage waste in Spain

BOE step 7 of 7 · Passed

It is a government bill. Introduced by the Government. It was introduced on 5 August 1997. Introduced by: Gobierno.

Official title: Government bill on Waste.

Source: Congreso de los Diputados, file 121/000078· updated 11 Nov

Automatic summary, not yet reviewed

  1. The law aims to prevent waste generation and to promote, in this order, its reduction, reuse, recycling and recovery, and also regulates contaminated soils, to protect the environment and human health.
  2. It applies to all types of waste, except air emissions, radioactive waste and discharges into water. For mining waste, dead animals, non-hazardous farm waste and decommissioned explosives, it only applies to aspects not covered by their specific rules.
  3. Powers are divided: the State draws up national waste plans and authorizes transfers to or from non-EU countries; the Autonomous Communities draw up their own plans and authorize, monitor and inspect waste production and management; and municipalities must provide urban waste collection, transport and disposal as a mandatory service.
  4. Anyone placing on the market products that become waste may be required to design them to ease recycling, to take charge of managing the resulting waste, or to accept a deposit, return and refund system. Voluntary agreements and cooperation agreements with public authorities are also allowed.
  5. Waste recovery and disposal activities need authorization from the Autonomous Community, and so do industries producing hazardous waste. Waste holders must hand waste over to a manager and pay the management costs, and uncontrolled abandonment or dumping of waste is banned.
  6. The Autonomous Communities will declare and inventory contaminated soils, and those responsible for the contamination must clean them up and restore them, with joint liability when there are several. Violations carry fines of up to 200,000,000 pesetas for the most serious ones.

Who it affects

  • Companies and industries that produce waste, especially hazardous waste: They need administrative authorization, keep records and file annual reports.
  • Manufacturers, importers and sellers of products that become waste: They may be required to manage the waste from their products or take part in deposit, return and refund systems.
  • Municipalities and local entities: They must collect, transport and dispose of urban waste as a mandatory service, and those with over 5,000 residents must set up separate collection.
  • Waste managers: They need authorization, keep documentary records and must meet safety measures for hazardous waste.
  • Owners and those responsible for contaminated soils: They must pay for and carry out the cleanup and restoration of soils declared contaminated.

Words worth knowing

Valorización (recovery)
Making use of the resources contained in waste, for example by recycling it or using it to produce energy, without harming health or the environment.
Gestor (waste manager)
A public or private person or entity that carries out waste operations such as collecting, transporting, recovering or disposing of it.
Recogida selectiva (separate collection)
Collecting recyclable and organic materials separately so they can be put to use.
Suelo contaminado (contaminated soil)
Land whose characteristics have been worsened by hazardous human-origin components in amounts that pose a risk to health or the environment.
Nota marginal (marginal note)
An annotation added to the Property Registry next to the record of a property.

It summarizes the law as published in the BOE. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 7 of 7 steps. It reached BOE, and today it is passed.

  1. Introduced5 August 1997Someone registers the text in the Congreso.
  2. Admitted3 September 1997The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendments5 September 1997Groups propose changes.
  4. Committee11 November 1997A committee goes through the text in detail.
  5. Plenary10 February 1998All 350 deputies vote.
  6. Senate19 February 1998The Senate can pass it, amend it or veto it.
  7. BOE26 April 1998It is published in the Official State Gazette (BOE) and comes into force.
See the 11 official steps on a timeline
Aug 1997Sept 1997Oct 1997Nov 1997Dec 1997Jan 1998Feb 1998Mar 199811. 5 August 1997: Presentación22. 3 September 1997: Comisión de Medio Ambiente Publicación desde 03/09/1997 hasta 05/09/199733. 3 September 1997: Calificación44. 5 September 1997: Comisión de Medio Ambiente Enmiendas desde 05/09/1997 hasta 15/10/199755. 15 October 1997: Comisión de Medio Ambiente Mesa - Calificación desde 15/10/1997 hasta 11/11/199766. 11 November 1997: Comisión de Medio Ambiente Debate de totalidad desde 11/11/1997 hasta 27/11/199777. 27 November 1997: Comisión de Medio Ambiente Informe desde 27/11/1997 hasta 03/02/199888. 3 February 1998: Comisión de Medio Ambiente Dictamen desde 03/02/1998 hasta 10/02/199899. 10 February 1998: Pleno Aprobación desde 10/02/1998 hasta 19/02/19981010. 19 February 1998: Senado desde 19/02/1998 hasta 26/04/19981111. 26 April 1998: Concluido - (Aprobado con modificaciones) desde 26/04/1998 hasta 13/05/1998 Nota: Fecha de concluido en el Senado

Was there a plenary vote?

We have no plenary vote linked to this law in the Congreso’s data.

What happens next

What happens now?

It is law, or will be once published in the BOE. It comes into force on the date its own text sets.

Published in the BOE: Law 10/1998, of April 21, on Waste.

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.