Bill to make power grids public and boost self-consumption

Admitted step 2 of 7 · Withdrawn

It is a members’ bill. Introduced by parliamentary groups, the Senate, regional governments or citizens. It was introduced on 26 May 2025. Introduced by: Grupo Parlamentario Republicano.

Official title: Private member's bill for the recognition of public ownership of electricity distribution networks and the promotion of self-consumption.

Source: Congreso de los Diputados, file 122/000197· updated 11 Nov

Automatic summary, not yet reviewed

  1. The bill would declare electricity distribution and transmission grids public property and recognize municipalities as owners of the grids in their territory, which they could manage directly or award as concessions.
  2. It proposes a new concession system to manage the grids of each distribution zone, with tenders lasting a maximum of 10 years based on service quality, transparency and renewables. The concessions would have to be tendered no later than December 31, 2026.
  3. Citizen Energy Communities could acquire, lease and manage distribution grids if they prove technical and economic capacity and reach 60% of supply points or energy in areas with more than 10,000 users, with compensation based on the book value of the assets.
  4. When a new grid from an urban development supplies more than 500 CUPS The code that identifies each electricity supply point, that is, each place connected to the grid. or has more than 5 MW of contracted power, ownership would pass to the municipality, which would also receive 50% of the operating profits of the transferred infrastructure.
  5. The bill would ban a single business group from taking part at the same time in generation, retailing and distribution, except for small operators with fewer than 100,000 customers.
  6. The proposal extends the allowed distances between generation and consumption for collective self-consumption, especially in small towns and rural areas, and allows combining different self-consumption modes in the same industrial or residential setting.

Who it affects

  • Municipalities (ayuntamientos): Would own the distribution grids in their territory and could manage them or tender them out, with technical and legal support from the Government.
  • Electricity distribution companies: Would lose grid ownership, become subject to concessions of at most 10 years, and be barred from combining activities.
  • Citizen Energy Communities: Could acquire, lease and manage distribution grids and supply energy to third parties.
  • Consumers and self-consumption developers: Would benefit from longer allowed distances between generation and consumption and more flexibility between self-consumption modes.

Words worth knowing

Concesión administrativa
A permit by which a public administration assigns a private company the management of a public service for a limited time.
CUPS
The code that identifies each electricity supply point, that is, each place connected to the grid.
SIEG
Servicio de interés económico general: a service that public authorities must guarantee to the whole population with quality and at a reasonable cost.
Autoconsumo
Self-consumption: producing electricity, for example with solar panels, to use it yourself.
Comunidad Ciudadana de Energía
Citizen Energy Community: a group of people, companies or entities organized to generate, manage and share energy.

It summarizes the text as it was introduced. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 2 of 7 steps. It reached Admitted, and today it is withdrawn.

  1. Introduced26 May 2025Someone registers the text in the Congreso.
  2. Admitted10 June 2025The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendmentsnot reachedGroups propose changes.
  4. Committeenot reachedA committee goes through the text in detail.
  5. Plenarynot reachedAll 350 deputies vote.
  6. Senatenot reachedThe Senate can pass it, amend it or veto it.
  7. BOEnot reachedIt is published in the Official State Gazette (BOE) and comes into force.
See the 6 official steps on a timeline
May 2025Jun 2025Jul 2025Aug 202511. 26 May 2025: Presentación22. 10 June 2025: Boletín Oficial de las Cortes Generales Publicación desde 10/06/2025 hasta 13/06/202533. 10 June 2025: Calificación44. 13 June 2025: Gobierno Contestación desde 13/06/2025 hasta 15/09/202555. 15 September 2025: Pleno Toma en consideración desde 15/09/2025 hasta 23/09/202566. 23 September 2025: Concluido - (Retirado) desde 23/09/2025 hasta 26/09/2025

Was there a plenary vote?

We have no plenary vote linked to this law in the Congreso’s data.

What happens next

What happens now?

Whoever introduced it withdrew it, or it was merged into another one. It goes no further.

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.