Skip to content

Where are you from?

Choose your province and we will tell you how the deputies and senators you elected vote, one by one.

 

We remember it in this browser. If you create an account, we keep it there.

Type a law, a topic, a person or a province.

What it is

Bill to transfer 19.99 cubic hectometers of water to the Guadalquivir basin

BOE step 7 of 7 · Passed

It is a members’ bill. Introduced by parliamentary groups, the Senate, regional governments or citizens. It was introduced on 24 October 2017. Introduced by: Comunidad Autónoma de Andalucía-Parlamento.

Official title: Private member's bill on the transfer of 19.99 hm3 of resources from the Hydrographic Demarcation of the Tinto, Odiel and Piedras rivers to the Hydrographic Demarcation of the Guadalquivir.

Source: Congreso de los Diputados, file 125/000018· updated 11 Nov

Automatic summary, not yet reviewed

  1. The text approved by the Ecological Transition Committee authorizes a transfer of up to 19.99 cubic hectometers per year of surface water from the Tinto, Odiel and Piedras basin to the Guadalquivir basin. The goal is to secure drinking water for the towns of El Condado de Huelva, improve irrigation reliability, and help recover the aquifers around Doñana.
  2. The transferred water could only be used for public supply and to irrigate farmland covered by the special plan for irrigated areas north of the Doñana forest belt. Using it for new urban developments, or to create or expand irrigated land outside that area, would be banned.
  3. Users of the transfer would have to pay regulation fees and water use tariffs, under the cost recovery principle. Any storage infrastructure needed would preferably be built in the receiving basin.
  4. All projects related to the transfer, both in the donor and receiving basins, would undergo environmental impact assessment, individually and jointly.
  5. The works needed for the transfer, listed in Annex I, would be declared of general interest to the State. That declaration would depend on a report proving their economic, technical, social and environmental feasibility.
  6. A technical management committee would be created, with representatives from the Ministry, the basin authorities and users, to decide transfer volumes based on hydrological conditions. The text repeals the earlier 2008 and 2015 agreements and the 2016 order that regulated the previous 4.99 cubic hectometer transfer.

Who it affects

  • The municipalities of El Condado de Huelva: Their water supply, currently unreliable from the Corumbel reservoir or dependent on the Almonte-Marismas aquifer, would become more secure.
  • Farmers irrigating north of Doñana: They could replace groundwater from the Almonte-Marismas aquifer with transferred surface water, and would have to pay fees and tariffs.
  • The donor basin of the Tinto, Odiel and Piedras: Its own needs would be guaranteed before any water is transferred, and works such as the Alcolea and Coronada dams would be prioritized.
  • Doñana National Park: The bill aims to reduce aquifer exploitation and support its recharge, improving the water balance of the area.

Words worth knowing

Hm3 (cubic hectometer)
A unit of water volume. One cubic hectometer equals one million cubic meters, or one billion liters.
Demarcación hidrográfica (river basin district)
The territory whose waters drain into the same basin or sea, managed as a unit to plan water use.
Cuenca cedente y receptora (donor and receiving basin)
The donor basin gives up water in the transfer; the receiving basin takes it.
Acuífero (aquifer)
A natural underground deposit of water stored between layers of soil and rock.
Caudal ecológico (environmental flow)
The minimum amount of water a river must keep so its ecosystems can survive.

It summarizes the text passed by the committee. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 7 of 7 steps. It reached BOE, and today it is passed.

  1. Introduced24 October 2017Someone registers the text in the Congreso.
  2. Admitted6 November 2017The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendments22 June 2018Groups propose changes.
  4. Committee3 October 2018A committee goes through the text in detail.
  5. Plenaryno dateAll 350 deputies vote.
  6. Senate24 October 2018The Senate can pass it, amend it or veto it.
  7. BOE21 November 2018It is published in the Official State Gazette (BOE) and comes into force.
See the 14 official steps on a timeline
Dec 2017Mar 2018Jun 2018Sept 201811. 24 October 2017: Presentación22. 6 November 2017: Mesa del Congreso Requerimiento de antecedentes desde 06/11/2017 hasta 04/12/201733. 6 November 2017: Boletín Oficial de las Cortes Generales Publicación desde 06/11/2017 hasta 10/11/201744. 6 November 2017: Calificación55. 10 November 2017: Gobierno Contestación desde 10/11/2017 hasta 19/12/201766. 19 December 2017: Pleno Toma en consideración desde 19/12/2017 hasta 12/06/201877. 12 June 2018: Mesa del Congreso Acuerdo subsiguiente a la toma en consideración desde 12/06/2018 hasta 19/06/201888. 19 June 2018: Comisión de Agricultura, Alimentación y Medio Ambiente Publicación desde 19/06/2018 hasta 22/06/201899. 22 June 2018: Comisión de Agricultura, Alimentación y Medio Ambiente Enmiendas desde 22/06/2018 hasta 26/06/20181010. 26 June 2018: Comisión de Transición Ecológica Enmiendas desde 26/06/2018 hasta 03/10/20181111. 3 October 2018: Comisión de Transición Ecológica Informe desde 03/10/2018 hasta 17/10/20181212. 17 October 2018: Comisión de Transición Ecológica Aprobación con competencia legislativa plena desde 17/10/2018 hasta 24/10/20181313. 24 October 2018: Senado desde 24/10/2018 hasta 21/11/20181414. 21 November 2018: Concluido - (Aprobado con modificaciones) desde 21/11/2018 hasta 14/01/2019

12 June 2018

How did the plenary vote?

More votes in favour 249 yes · 85 no · 7 abst.

Voted on: Private member's bill from the Parliament of Andalusia, on the transfer of 19.99 Hm3 of resources from the Tinto, Odiel and Piedras Rivers Hydrographic Demarcation to the Guadalquivir Hydrographic Demarcation.

Source: Congreso de los Diputados, vote 1 of sitting 123· updated 10 Nov

Each dot is a seat. Tap one, or use the arrow keys, to see who it is.

Your province

How did the deputies from your province vote?

And your senators: the Senate does not link its votes to this law in its open data, so we cannot put them side by side here.

Or see how most of each province voted
More details: how each group and each province voted

The groups

Who voted in favour and who against?

In favour, most of Socialista, Ciudadanos and Popular en el Congreso. Against, most of Mixto, Gcup-ec-em and GER. 5 deputies voted differently from their group.

By province: in 47 most voted in favour; in 4, against.

Coloured by how most of each province’s deputies voted.

  • In favour: 47
  • Against: 4
  • Tie: 1
Result by parliamentary group
GroupSeatsHow it voted
Socialista84
83 in favour · 1 did not vote
Vasco (EAJ-PNV)5
5 abst.
Mixto19
3 in favour · 10 against · 2 abst. · 4 did not vote
Ciudadanos32
32 in favour
Gcup-ec-em67
66 against · 1 did not vote
GER9
9 against
Popular en el Congreso134
131 in favour · 3 did not vote

What happens next

What happens now?

It is law, or will be once published in the BOE. It comes into force on the date its own text sets.

The same initiative in the other chamber:

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.