What it is
Bill to allow renewable self-consumption of electricity with net metering
It is a members’ bill. Introduced by parliamentary groups, the Senate, regional governments or citizens. It was introduced on 19 July 2016. Introduced by: Comunidad Autónoma de la Región de Murcia - Asamblea Regional.
Official title: Private member's bill on the generation of renewable electric energy for self-consumption (corresponds to file numbers 125/000020/0000 of the X Legislature and 125/000003/0000 of the XI Legislature).
Source: Congreso de los Diputados, file 125/000003· updated 11 Nov
Automatic summary, not yet reviewed
- The bill would set the administrative, technical and economic conditions for self-consumption of renewable electricity, with two compensation systems: net metering and deferred net metering.
- It defines five self-consumption modes depending on how the generation installation is connected: from installations that never feed power into the grid to installations over 1 MW connected through a direct line, including shared installations on one property or several.
- In the net metering mode, consumers must request connection from the distribution company, which must respond within fifteen days for a new connection; for a modification, if it does not respond within fifteen days, its approval is assumed.
- Net metering is calculated monthly by subtracting the cost of energy fed into the grid from the cost of energy consumed from it; depending on the result, either the consumer pays the utility or the utility pays the consumer.
- Under deferred net metering, surplus energy is transferred to the supplier without direct payment, but it creates deferred consumption rights that can be used for up to 12 months to offset energy consumed.
- All consumers using self-consumption must register in the administrative self-consumption registry, handled exclusively online, and violations are sanctioned under the Electricity Sector Act.
Who it affects
- Electricity consumers who install solar panels or other renewable sources for their own use: They must register and choose one of the self-consumption modes.
- Electricity distribution and supply companies: They must process connections within set deadlines, keep accounts of deferred consumption rights, and report information to the CNMC.
- Electricity producers: They can feed surplus energy into the grid and receive compensation under net metering.
- Regional governments and town councils: They will keep registries of self-consumption installations in their territory and access state registry data.
Words worth knowing
- Autoconsumo (self-consumption)
- Using electricity you generate yourself at your own installation, for example with solar panels.
- Balance neto (net metering)
- A monthly calculation comparing the value of energy you feed into the grid with the value of energy you take from it; depending on the result, one party pays the other.
- Balance neto diferido (deferred net metering)
- A system where surplus energy is not paid in money but gives the right to consume an equivalent amount for free later, for up to 12 months.
- Contador bidireccional (bidirectional meter)
- A meter that measures energy in both directions: what comes in from the grid and what is fed into it.
- Línea directa (direct line)
- A cable linking a power generation site directly to a consumption site, without going through the general grid.
It summarizes the text as it was introduced. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries
Where it stands
How far did it get?
It took 3 of 7 steps. It reached Amendments, and today it is unfinished.
- Introduced19 July 2016Someone registers the text in the Congreso.
- Admitted6 September 2016The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
- Amendments19 October 2018Groups propose changes.
- Committeenot reachedA committee goes through the text in detail.
- Plenarynot reachedAll 350 deputies vote.
- Senatenot reachedThe Senate can pass it, amend it or veto it.
- BOEnot reachedIt is published in the Official State Gazette (BOE) and comes into force.
See the 9 official steps on a timeline
9 October 2018
How did the plenary vote?
Voted on: Private member's bill by the Regional Assembly of Murcia, on the generation of renewable electrical energy for self-consumption.
Source: Congreso de los Diputados, vote 1 of sitting 146· updated 10 Nov
Each dot is a seat. Tap one, or use the arrow keys, to see who it is.
Your province
How did the deputies from your province vote?
And your senators: the Senate does not link its votes to this law in its open data, so we cannot put them side by side here.
Or see how most of each province voted
- A Coruña More votes in favour 7 yes · 0 no · 1 abst.
- Albacete More votes in favour 4 yes · 0 no
- Alicante/Alacant More votes in favour 12 yes · 0 no
- Almería More votes in favour 6 yes · 0 no
- Araba/Álava More votes in favour 3 yes · 0 no · 1 abst.
- Asturias More votes in favour 8 yes · 0 no
- Ávila More votes in favour 3 yes · 0 no
- Badajoz More votes in favour 6 yes · 0 no
- Barcelona More votes in favour 29 yes · 0 no
- Bizkaia More votes in favour 6 yes · 0 no · 2 abst.
- Burgos More votes in favour 4 yes · 0 no
- Cáceres More votes in favour 4 yes · 0 no
- Cádiz More votes in favour 9 yes · 0 no
- Cantabria More votes in favour 5 yes · 0 no
- Castellón/Castelló More votes in favour 5 yes · 0 no
- Ceuta More votes in favour 1 yes · 0 no
- Ciudad Real More votes in favour 5 yes · 0 no
- Córdoba More votes in favour 6 yes · 0 no
- Cuenca More votes in favour 3 yes · 0 no
- Gipuzkoa More votes in favour 4 yes · 0 no · 2 abst.
- Girona More votes in favour 5 yes · 0 no
- Granada More votes in favour 7 yes · 0 no
- Guadalajara More votes in favour 3 yes · 0 no
- Huelva More votes in favour 5 yes · 0 no
- Huesca More votes in favour 3 yes · 0 no
- Illes Balears More votes in favour 8 yes · 0 no
- Jaén More votes in favour 5 yes · 0 no
- La Rioja More votes in favour 4 yes · 0 no
- Las Palmas More votes in favour 8 yes · 0 no
- León More votes in favour 3 yes · 0 no
- Lleida More votes in favour 4 yes · 0 no
- Lugo More votes in favour 4 yes · 0 no
- Madrid More votes in favour 34 yes · 0 no · 1 abst.
- Málaga More votes in favour 11 yes · 0 no
- Melilla More votes in favour 1 yes · 0 no
- Murcia More votes in favour 10 yes · 0 no
- Navarra More votes in favour 5 yes · 0 no
- Ourense More votes in favour 4 yes · 0 no
- Palencia More votes in favour 2 yes · 0 no
- Pontevedra More votes in favour 7 yes · 0 no
- Salamanca More votes in favour 4 yes · 0 no
- Santa Cruz de Tenerife More votes in favour 6 yes · 0 no
- Segovia More votes in favour 3 yes · 0 no
- Sevilla More votes in favour 12 yes · 0 no
- Soria More votes in favour 2 yes · 0 no
- Tarragona More votes in favour 6 yes · 0 no
- Teruel More votes in favour 3 yes · 0 no
- Toledo More votes in favour 6 yes · 0 no
- Valencia/València More votes in favour 16 yes · 0 no
- Valladolid More votes in favour 5 yes · 0 no
- Zamora More votes in favour 3 yes · 0 no
- Zaragoza More votes in favour 7 yes · 0 no
More details: how each group and each province voted
The groups
Who voted in favour and who against?
In favour, most of Socialista, Mixto, Ciudadanos, Gcup-ec-em, GER and Popular en el Congreso. 2 deputies voted differently from their group.
By province: in 52 most voted in favour; in 0, against.
Coloured by how most of each province’s deputies voted.
- In favour: 52
- Against: 0
| Group | Seats | How it voted |
|---|---|---|
| Socialista | 84 | 84 in favour |
| Vasco (EAJ-PNV) | 5 | 5 abst. |
| Mixto | 19 | 16 in favour · 3 did not vote |
| Ciudadanos | 32 | 30 in favour · 2 did not vote |
| Gcup-ec-em | 67 | 67 in favour |
| GER | 9 | 9 in favour |
| Popular en el Congreso | 134 | 130 in favour · 2 abst. · 2 did not vote |
What happens next
What happens now?
The legislature ended before it finished. To go on, someone would have to introduce it again in the new Cortes.
It has not been presented again yet.
Sources
Where does all this come from?
- Congreso de los Diputados, file 125/000003
Official title, type, author, dates and stage.
Retrieved 11 November 2026
- Congreso de los Diputados, vote 1 of sitting 146
The count and every seat’s vote.
Retrieved 10 November 2026
- The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
- Each deputy’s province is the one of their seat on the day of the vote.
- We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.