Skip to content

Where are you from?

Choose your province and we will tell you how the deputies and senators you elected vote, one by one.

 

We remember it in this browser. If you create an account, we keep it there.

Type a law, a topic, a person or a province.

What it is

Bill to limit the buying and selling of water use rights

Admitted step 2 of 7 · Unfinished

It is a members’ bill. Introduced by parliamentary groups, the Senate, regional governments or citizens. It was introduced on 8 March 2017. Introduced by: Grupo Parlamentario Confederal de Unidos Podemos-En Comú Podem-En Marea.

Official title: Private member's bill against the commercialization of water concession rights.

Source: Congreso de los Diputados, file 122/000083· updated 11 Nov

Automatic summary, not yet reviewed

  1. The bill seeks to stop the commodification of water. According to the explanatory statement, water in Spain is public domain, and sales of water use rights are concentrating those rights in few hands.
  2. The bill would repeal the fourth and fifth final provisions of Law 21/2013 on environmental assessment. This would restore the requirement that water transfers between river basins through cession contracts be authorized by law, with parliamentary oversight.
  3. The bill would restrict water rights cession contracts. They could only take place during droughts or exceptional circumstances, on a temporary basis, and the basin authority could deny them or buy the water itself through a right of first refusal.
  4. The bill would take effect the day after its publication in the Official State Gazette, except for measures that increase spending or reduce budget revenues, which would wait until the next fiscal year.

Who it affects

  • Concession holders and water use rights holders, such as irrigators: Their ability to sell or cede water use rights would be limited: cessions would only be possible temporarily during droughts or exceptional circumstances.
  • River basin authorities: They would regain the power to authorize or deny cessions, with a right of first refusal on the water volumes.
  • Congress of Deputies (Congreso de los Diputados): They would regain parliamentary control over inter-basin water transfers, since a law would again be required to authorize them.
  • Autonomous Communities and the Ministry of Agriculture, Fisheries, Food and Environment: They would receive copies of irrigation water cession contracts and issue a prior report.

Words worth knowing

Concesión (concession)
A permit granted by the administration to privately use a public asset, such as water.
Dominio público (public domain)
An asset that belongs to everyone and is meant for public purposes, not private profit.
Contrato de cesión (cession contract)
An agreement by which a water rights holder temporarily transfers them to another, with administration approval.
Trasvase (water transfer)
Moving water from one river basin to another through infrastructure.
Silencio administrativo (administrative silence)
If the administration does not answer in time, the request is deemed granted or denied depending on the case.

It summarizes the text as it was introduced. It is written by artificial intelligence and may contain mistakes: the official text is what counts. Read the official text · How we make summaries

Where it stands

How far did it get?

It took 2 of 7 steps. It reached Admitted, and today it is unfinished.

  1. Introduced8 March 2017Someone registers the text in the Congreso.
  2. Admitted14 March 2017The Bureau of the Congreso accepts it and, for a members’ bill, the plenary decides whether to consider it.
  3. Amendmentsnot reachedGroups propose changes.
  4. Committeenot reachedA committee goes through the text in detail.
  5. Plenarynot reachedAll 350 deputies vote.
  6. Senatenot reachedThe Senate can pass it, amend it or veto it.
  7. BOEnot reachedIt is published in the Official State Gazette (BOE) and comes into force.
See the 6 official steps on a timeline
Dec 2017Dec 201811. 8 March 2017: Presentación22. 14 March 2017: Boletín Oficial de las Cortes Generales Publicación desde 14/03/2017 hasta 17/03/201733. 14 March 2017: Calificación44. 17 March 2017: Gobierno Contestación desde 17/03/2017 hasta 27/04/201755. 27 April 2017: Pleno Toma en consideración desde 27/04/2017 hasta 05/03/201966. 5 March 2019: Concluido - (Caducado) desde 05/03/2019 hasta 27/03/2019

Was there a plenary vote?

We have no plenary vote linked to this law in the Congreso’s data.

What happens next

What happens now?

The legislature ended before it finished. To go on, someone would have to introduce it again in the new Cortes.

It has not been presented again yet.

Sources

Where does all this come from?

  • The data comes from the open files of the Congreso, the Senate and the BOE, unaltered.
  • Each deputy’s province is the one of their seat on the day of the vote.
  • We only say “passed” or “rejected” when the majority needed is certain; otherwise we say which side had more votes.